CyberHappenings logo

Track cybersecurity events as they unfold. Sourced timelines. Filter, sort, and browse. Fast, privacy‑respecting. No invasive ads, no tracking.

Critical Path Traversal in Ubiquiti UniFi Network Application Enables Account Takeover

First reported
Last updated
1 unique sources, 1 articles

Summary

Hide ▲

A critical severity vulnerability, CVE-2026-22557, in Ubiquiti’s UniFi Network Application (versions 10.1.85 and earlier) allows remote attackers on the local network to execute path traversal attacks and gain unauthorized access to system files. This can be exploited to hijack user accounts without privileges or user interaction, enabling full account takeover in low-complexity attacks. The flaw impacts UniFi Network Application deployments, including those managed via UniFi Cloud Gateway, switches, access points, and gateways. Ubiquiti has addressed the issue in versions 10.1.89 and later. A second vulnerability, an authenticated NoSQL injection flaw, was also patched, enabling privilege escalation for authenticated attackers.

Timeline

  1. 19.03.2026 15:00 1 articles · 23h ago

    Ubiquiti patches critical path traversal flaw (CVE-2026-22557) in UniFi Network Application

    Ubiquiti disclosed and patched a maximum-severity path traversal vulnerability, CVE-2026-22557, in the UniFi Network Application (versions 10.1.85 and earlier). The flaw allows attackers on the local network to access system files and hijack user accounts without privileges or user interaction. Patches are available in versions 10.1.89 and later. A second authenticated NoSQL injection flaw enabling privilege escalation was also addressed.

    Show sources

Information Snippets

  • CVE-2026-22557 is a path traversal vulnerability in Ubiquiti UniFi Network Application affecting versions 10.1.85 and earlier.

    First reported: 19.03.2026 15:00
    1 source, 1 article
    Show sources
  • Successful exploitation of CVE-2026-22557 allows attackers on the local network to access system files and potentially hijack user accounts without requiring user interaction or elevated privileges.

    First reported: 19.03.2026 15:00
    1 source, 1 article
    Show sources
  • Ubiquiti patched the flaw in UniFi Network Application versions 10.1.89 and later.

    First reported: 19.03.2026 15:00
    1 source, 1 article
    Show sources
  • A second vulnerability, an authenticated NoSQL injection flaw, enables privilege escalation for attackers with authenticated access to the network.

    First reported: 19.03.2026 15:00
    1 source, 1 article
    Show sources
  • The UniFi Network Application is management software used to configure, monitor, and optimize Ubiquiti UniFi networking hardware, including access points, switches, and gateways.

    First reported: 19.03.2026 15:00
    1 source, 1 article
    Show sources
  • Ubiquiti products have historically been targeted by state-backed groups and cybercriminals for botnet construction and malicious traffic concealment.

    First reported: 19.03.2026 15:00
    1 source, 1 article
    Show sources